Projects
End customer: Rana, Iceland
Application: Compensation of a 130 kV Substation.
Assignment: To design 3 x 20 Mvar, 130 kV harmonic filter.
Extent of work:
- Harmonic measurements on 130 kV bus bars in order to determine existing harmonics
- Harmonic study
- Transient study
- Selection of suitable filter configuration in order to meet harmonic distortion requirements
- Calculation of rated data of filter components
- Selection of protection scheme and protection settings
- Erection supervision, commissioning and verification measurements
End customer: PGC, Poland
Application: Compensation of three 110 kV Substations.
Assignment: To design 3 x 50 Mvar, 110 kV harmonic filters in three different locations.
Extent of work:
- Harmonic measurements on 110 kV and 400 kV bus bars in order to determine existing harmonics
- Harmonic study
- Transient study
- Selection of suitable filter configuration in order to meet harmonic distortion requirements
- Calculation of rated data of filter components
- Selection of protection scheme and protection settings
- Erection supervision, commissioning and verification measurements
End customer: Elektroperu, Peru
Application: Compensation of 220/60 kV Substation.
Assignment: To design 90 Mvar compensation in three steps of 30 Mvar.
Extent of work:
- Harmonic measurements on 60 kV and 220 kV bus bars in order to determine pre-existing harmonics
- Harmonic study
- Transient study
- Selection of suitable filter configuration in order to meet harmonic distortion requirements
- Calculation of rated data of filter components
- Erection supervision, commissioning and verification measurements