End customer: Rana, Iceland

Application: Compensation of a 130 kV Substation.

Assignment: To design 3 x 20 Mvar, 130 kV harmonic filter.

Extent of work:

  • Harmonic measurements on 130 kV bus bars in order to determine existing harmonics
  • Harmonic study
  • Transient study
  • Selection of suitable filter configuration in order to meet harmonic distortion requirements
  • Calculation of rated data of filter components
  • Selection of protection scheme and protection settings
  • Erection supervision, commissioning and verification measurements


End customer: PGC, Poland

Application: Compensation of three 110 kV Substations.

Assignment: To design 3 x 50 Mvar, 110 kV harmonic filters in three different locations.

Extent of work:

  • Harmonic measurements on 110 kV and 400 kV bus bars in order to determine existing harmonics
  • Harmonic study
  • Transient study
  • Selection of suitable filter configuration in order to meet harmonic distortion requirements
  • Calculation of rated data of filter components
  • Selection of protection scheme and protection settings
  • Erection supervision, commissioning and verification measurements

End customer: Elektroperu, Peru

Application: Compensation of 220/60 kV Substation.

Assignment: To design 90 Mvar compensation in three steps of 30 Mvar.

 Extent of work:

  • Harmonic measurements on 60 kV and 220 kV bus bars in order to determine pre-existing harmonics
  • Harmonic study
  • Transient study
  • Selection of suitable filter configuration in order to meet harmonic distortion requirements
  • Calculation of rated data of filter components
  • Erection supervision, commissioning and verification measurements